three 22mm copper pipes need dropping from 300mmm to floor level one end only and 2 copper pipes need 90 degree bends to reconnect because the bath taps are now not needed, reason is we have taken the bath out and going to replace it with a low level walk- shower, going to raise the floor were the bath was to 100mm so the pipes don't have to go under the floor- boards so it makes it a little bit easier to alter the pipe work, hope this makes a bit of sense, basically the existing pipes are to high to install the new shower tray
There are currently no reviews for this tradesperson. If you've had a job completed by them in the past, leave a review below.
Leave a reviewInvite Homes to quote for your job