Filter by:
Sort by:
I require a 5m x 3m concrete slab. 200mm soil removal from level ground, mot1 base, shuttering. Ideally reinforced. For log cabin.
As a builder, do you prefer to carry out extensions or conversions?
I have been paving my front garden. I had noticed a couple of slabs were sinking a little so I dug them up and relaid I have left a gap of 300mm to the house with about 4 inches of small chippings. The paving is running away at at least 1/60. Also not much rain water falls in that area due to the over hang of about 300mm of the roof What I noticed after finishing is that the slabs although 300mm away are about 30mm higher than the bottom of the dpc. There doesn't appear to have been problems when the two large slabs were sloping in and that's been fixed. Perhaps I am overthrowing it but I just wanted to check
Hi, I had arranged for a joiner to lay a herringbone floor but upon checking the floor it was springy in one section. The joiner believes I may need a new joist support or a new joist. Does anyone know if this is a big job, what’s costs are involved and how long it will take to repair. Thank you.
If I take care of my carport well, how long should I expect it to last?
How long does it take to have a triple carport fitted to a building?
Builder built 2 block gable end walls which failed planning he is now building a third brick wall on to the 600 wide foundation is this ok with building regs and would it pass planning
Hi, we are in the process of purchasing a Victorian property and survey has noted the incomplete fire barrier issue with the party wall in the attic. Question is: is it best to build a fire wall etc with blocks or look at fire curtain type product? Also average costs for install etc of these options. Any advice appreciated
Are there any practical differences between hiring a self-employed builder and a builder from a building company? Is there anything I should be aware of?
We are buying a property in the kitchen is the top of the last few runs of the stairs its boxed off can anyone tell me if we can have the box removed and then made so we get extra room under it for a fridge freezer? and what fire regs we may need to meet
Are you looking for advice on a DIY project or have a question for our tradespeople?
We'll email your question to tradespeople who are skilled in your chosen category.
{{ first(ask.errors)[0] }}
Over 1 million homeowners and over 50,000 tradespeople
use MyJobQuote nationwide each year